久久青草精品欧美日韩精品,97人妻无码一区二区精品免费,老司机性色福利精品视频,亚洲女线av影视宅男宅女天堂

Qingdao Haixi Plastic Machinery Co., Ltd. teaches you the maintenance knowledge of heat preservation

source:www.hbhmxcl.com         Release time:2020-03-30 Return list
Qingdao Haixi Plastic Machinery Co., Ltd. has sold nearly 1000 sets of insulation pipe equipment and hundreds of customers. Every time a customer asks about how to maintain the heat preservation pipe equipment, he feels an urgent need to popularize the maintenance knowledge of the customer. So today, taking advantage of this opportunity to teach some relevant knowledge is also a return to the customer.
1. Dust removal work shall be carried out frequently, with the focus on cleaning the dust of frequency converter, governor and PLC. Compressed air can be used to blow air inside the components, especially the dust of all electrical components inside the electric control box. During cleaning, attention shall be paid not to moisture.
2. Check the components of the electric cabinet regularly, and replace the aging or poor contact components in time.
3. The gearbox lubricating oil shall be changed once every 4000-5000 hours, at least once a year.
4. Check the moving parts of the equipment frequently to see if there is enough lubrication. In particular, the screw rod, roller, bearing, guide post and other parts that run frequently can prevent the moving parts from being stuck due to the low temperature in winter, thus affecting the normal production. Bearings, cardan shafts, etc. need to be greased regularly.
5. Check the coaxiality and wear of the rubber pad at the coupling every three months.
6. The oil filter element of the hydraulic system needs to be replaced once half a year, and the pressure of the energy storage tank needs to be checked regularly.
7. Please check the tension of various belt, chain and other transmission parts. The low temperature may damage the original tension balance, the lighter may damage the belt and chain, and the heavier may cause the parts to be scrapped.
. when the insulation pipe equipment needs to be shut down temporarily, first record the rated parameters in the computer screen, so that it can be checked before the next start-up. If there is any difference, please input according to the recorded data. Please drain the water in the vacuum pump after shutdown to prevent the pump leaves from rusting.
9. When you want to restart the machine next time, please use a multimeter to measure whether there is a short circuit between the three-phase wires and between the three-phase wires and the ground, so as to prevent the mouse from biting the wires and causing a short circuit.
10. If the insulation pipe equipment needs to be shut down for a long time, the water of the water supply equipment shall be drained to prevent short circuit caused by long-term shutdown, damp dust inside the electrical components, or freezing of the pump vacuum pump caused by low temperature in winter.
主站蜘蛛池模板: 久久综合久久鬼色| 亚洲熟女乱色一区二区三区| 成人无码免费视频在线播| 粗大猛烈进出高潮视频二| 男女裸交无遮挡啪啪激情试看 | 国产精品亚洲综合色区韩国| 777米奇影院狠狠色| 少妇高潮一区二区三区99| 午夜视频在线| 青草青草久热国产精品| 色综合亚洲一区二区小说性色aⅴ| 久久久久日本精品人妻aⅴ毛片| 真人抽搐一进一出视频| 性欧美丰满熟妇xxxx性久久久| 人妻暴雨中被强制侵犯在线| 免费观看又色又爽又湿的软件 | 亚洲乱码卡一卡二卡新区中国| 狠狠做久久深爱婷婷| 国产精品自在在线午夜免费| 成人午夜精品无码区久久| 国产-第1页-浮力影院| 熟女精品视频一区二区三区| 在线a亚洲视频播放在线观看 | 香港三日本8a三级少妇三级99| 亚洲高清揄拍自拍| 日本国产制服丝袜一区| 日日澡夜夜澡人人高潮| 伊人久久精品亚洲午夜| 中文字幕亚洲男人的天堂网络 | 久久综合狠狠综合久久激情| 婷婷综合久久狠狠色99h| 偷窥国产亚洲免费视频| 亚洲中文字幕无码一久久区| 无码人妻丰满熟妇a片护士| 成人久久精品一区二区三区| 国产成年无码久久久久毛片| 末发育娇小性色xxxxx视频| 极品少妇xxxx| 在线播放亚洲第一字幕| 18禁无遮挡羞羞污污污污免费| 日韩v亚洲v欧美v精品综合|